THE PROJECT.
J&J performed
01Traffic control & night work
02Open-cut excavation in a live lane
03Live main connection
04Fire-service line installation
05Backfill & compaction
06Concrete flatwork restoration
The challenge
A fire service line going into a UDOT roadway, which means working in state right-of-way under permit: a live traffic lane, restricted night working hours, and a connection taken off a main that could not be shut down. The roadway had to be back in service by morning, every night.
The result
Line installed and connected, roadway restored with flowfill and the concrete flatwork put back to UDOT standard. The lane went back to traffic at the end of each shift.
- Delivered for
- Provo City Housing Authority
- Setting
- UDOT right-of-way, live traffic lane
- Worked
- Nights, under traffic control
- J&J scope
- Excavation, tap, backfill, flowfill & restoration coordination