Skip to content

Fire service — UDOT right-of-way

Provo Fire Service

Fire-service work in UDOT right-of-way including traffic control, excavation, live-main connection, backfill, flowfill and surface restoration.

Location
Provo, UT

Project scope

THE PROJECT.

J&J performed
01Traffic control & night work
02Open-cut excavation in a live lane
03Live main connection
04Fire-service line installation
05Backfill & compaction
06Concrete flatwork restoration

The challenge

A fire service line going into a UDOT roadway, which means working in state right-of-way under permit: a live traffic lane, restricted night working hours, and a connection taken off a main that could not be shut down. The roadway had to be back in service by morning, every night.

The result

Line installed and connected, roadway restored with flowfill and the concrete flatwork put back to UDOT standard. The lane went back to traffic at the end of each shift.

Delivered for
Provo City Housing Authority
Setting
UDOT right-of-way, live traffic lane
Worked
Nights, under traffic control
J&J scope
Excavation, tap, backfill, flowfill & restoration coordination

Next project

HAVE A PROJECT COMING UP?